R O P E A C C E S S S O L U T I O N S
Case Study:Banner InstallationClientHarris Sign – Coventry MBC
ProblemHang two banners, covering four storeys of a thirteen storey office building, within Coventry City centre, to promote the World Children’s Games and the British Olympic bid
SolutionRope Task technicians rigged wire frame attached to nonpenetrating anchor brackets. Banners were then attached to frame and unveiled in the presence of MP’s and large crowd in celebration of World Children’s Games, all using rope access techniques to gain access to elevations of the building.
|

