R O P E A C C E S S S O L U T I O N S
Case Study:
Trafford Centre,Manchester
Client
Shawton – Bovis lend lease
Problem
High level atrium located within new John Lewisstore required a number of tasks to be completedas scaffold had been removed
Solution
Rope Task technicians carried out the followingtasks within the atrium, using existing steelworkand over 500 preinstalleddedicated rope accessanchor points to access work areas.
- Installed dedicated rope access anchor points,using aid climb techniques to climb aroundexisting structure. Eyebolts were installedusing either magnetic drills or drill and tapmethods.
- Remove and replace existing high level lightbulbs
- Remove and replace existing high level coldcathode (neon lighting) tubes
- Repair plaster finish to high level walls
- Paint all existing high level steelwork and wallswithin the atrium
- Install lighting to architectural steel structurewithin atrium
|