R O P E A C C E S S S O L U T I O N S
Case Study:The Brunswick Centre, LondonClientISG InteriorExterior plc.
ProblemAfter installing feature neon lighting to eight water towers at the Brunswick Centre, future access for maintenance of the neon lighting was needed. Costs of erecting scaffold were deemed to expensive. SolutionRope Task technicians installed over 350 safety anchor points conforming to EN 795. These anchor points will allow future access by specialist teams of rope access technicians to carry out maintenance and replacement of the neon tubes.
|

