safety is our main priority

We would prefer to be as transparent as possible and show potential clients that safety is the main priority of the rope access management team here at Rope Task.

Therefore, we have updated this page with current rope access safety method statements, risk assessments and our own work procedures. 

safety is our main priority

We would prefer to be as transparent as possible and show potential clients that safety is the main priority of the rope access management team here at Rope Task.

Therefore, we have updated this page with current rope access safety method statements, risk assessments and our own work procedures. 

Confined Space Works

Rope Task last week completed the specialist coating of steelwork under the main swimming pool area of The Abbey Hotel & Golf Club in Redditch Worcestershire. This involved access to a confined space and special planning to eliminate the risk involved with working in this difficult to access area.

 
Risks that needed to be eliminated included, working in confined spaces, demolition, COSHH controls with the chemicals present in the confined space and also with the use of a four stage coatings system to the steelwork. 

 
Emergency planning was included in the risk assessment for working in the confined space, which included all regular PPE being supplied along with personal gas monitors and escape sets issued to all operatives. Along with a rescue plan for evacuation from the confined space should an emergency arise.

 
Rope Task operatives are all NC4 confined space trained for high risk areas under the City & Guilds training programme and operate confined space operations in and around the Midlands area on a regular basis. 

 
Rope Task have built a reputation for solving problems at height using rope access techniques or below ground using our specialist confined space services, for many customers across the West Midlands.


For more information on our confined space services please visit our site at 
 
www.confined-space-entry.co.uk
 
 
 
 
Loading

Rope Task Limited
Hillside House
5 Brunswick Terrace
Wednesbury
West Midlands WS10 9DA

T: 0121 502 4268
admin@ropetask.com

 

fb.jpgtwitter.jpgyoutube.jpgblog.jpg

from our case studies jaguar land rover

Rope Task were contacted by Freudenberg, a global technology​ group supplying filtration systems to high tech manufacturing plants. The problem they had was the replacement of high-level filters to the ducting systems within the Jaguar Land Rover paint shop. This was not possible using scaffold or MEWP access machines due to conveyor track systems that transport vehicles through the paint shop process...

Links   l  Privacy  l  Site MapDesigned By Nutcracker  l  © 2019 Rope Task Limited

 

Rope Task is rated 5 stars on Facebook based on 5 reviews

approvedkeesafety.png

safecontractor.png

chas.png

CFA logo.jpg

Rope Task Limited
Hillside House  |  5 Brunswick Terrace  |  Wednesbury
West Midlands  |  WS10 9DA
T: 0121 502 4268  |  admin@ropetask.com

fb.jpgtwitter.jpgyoutube.jpgblog.jpg