safety is our main priority

We would prefer to be as transparent as possible and show potential clients that safety is the main priority of the rope access management team here at Rope Task.

Therefore, we have updated this page with current rope access safety method statements, risk assessments and our own work procedures. 

safety is our main priority

We would prefer to be as transparent as possible and show potential clients that safety is the main priority of the rope access management team here at Rope Task.

Therefore, we have updated this page with current rope access safety method statements, risk assessments and our own work procedures. 

Stadium Rope Access

Rope Task have completed the installation of all high level advertising signs at the Premier League football ground of West Bromwich Albion.
 
On top of the three main stands advertising boards needed to be installed for the new team sponsors, regular access methods were not practicable as only a limited space was available for access between the stand and the playing surface.
 
Rope Task were called upon to use specialist rope access techniques to access across fragile roofs using pre-installed fall protection systems and also to use industrial abseil techniques to access the upper front elevation of three of the stands.
 
Old signs had to be safely removed and lowered to the ground and new signs hauled up to the top of the stand and securely fixed. This was all completed using only rope access equipment and the experience of our rope access teamwho have over 20 years experience of complex rope access works and work at height experience.
 
 
 
Loading

Rope Task Limited
Hillside House
5 Brunswick Terrace
Wednesbury
West Midlands WS10 9DA

T: 0121 502 4268
admin@ropetask.com

 

fb.jpgtwitter.jpgyoutube.jpgblog.jpg

from our case studies jaguar land rover

Rope Task were contacted by Freudenberg, a global technology​ group supplying filtration systems to high tech manufacturing plants. The problem they had was the replacement of high-level filters to the ducting systems within the Jaguar Land Rover paint shop. This was not possible using scaffold or MEWP access machines due to conveyor track systems that transport vehicles through the paint shop process...

Links   l  Privacy  l  Site MapDesigned By Nutcracker  l  © 2019 Rope Task Limited

 

Rope Task is rated 5 stars on Facebook based on 5 reviews

approvedkeesafety.png

safecontractor.png

chas.png

CFA logo.jpg

Rope Task Limited
Hillside House  |  5 Brunswick Terrace  |  Wednesbury
West Midlands  |  WS10 9DA
T: 0121 502 4268  |  admin@ropetask.com

fb.jpgtwitter.jpgyoutube.jpgblog.jpg