safety is our main priority

We would prefer to be as transparent as possible and show potential clients that safety is the main priority of the rope access management team here at Rope Task.

Therefore, we have updated this page with current rope access safety method statements, risk assessments and our own work procedures. 

safety is our main priority

We would prefer to be as transparent as possible and show potential clients that safety is the main priority of the rope access management team here at Rope Task.

Therefore, we have updated this page with current rope access safety method statements, risk assessments and our own work procedures. 

Difficult Access Cleaning

How do you remove an architectural feature suspended 25 meters off the ground between three high rise apartment blocks in the centre of Manchester?
 
 
We were given the challenge of removing the high level "Sphere" so that temporary mast climbers could be installed for essential cladding maintenance on the building. The problem was that the rigging cables holding the "Sphere" would clash with the upward movement of the mast climbers. 
 
Rope Task used lifting equipment to safely remove and extend the rigging cables, so that the "Sphere" moved closer to one of the buildings which allowed the "Sphere" to be rigged with slings, lifted, all cables safely removed and the "Sphere" lowered to the ground. 
 
 
This operation took in total 7 hours, without using cranes due to the difficult access and unstable ground below the "Sphere"
 
 
Again we proved what our specialist rope access team can achieve with the correct planning, assessment and experienced personnel.

Missing glazing
unit

Failed rivet
fixings

Failed fixings & loose cladding

Failed aluminium
cladding

Arson attack
Inspection

 
 
 
Loading

Rope Task Limited
Hillside House
5 Brunswick Terrace
Wednesbury
West Midlands WS10 9DA

T: 0121 502 4268
admin@ropetask.com

 

fb.jpgtwitter.jpgyoutube.jpgblog.jpg

from our case studies jaguar land rover

Rope Task were contacted by Freudenberg, a global technology​ group supplying filtration systems to high tech manufacturing plants. The problem they had was the replacement of high-level filters to the ducting systems within the Jaguar Land Rover paint shop. This was not possible using scaffold or MEWP access machines due to conveyor track systems that transport vehicles through the paint shop process...

Links   l  Privacy  l  Site MapDesigned By Nutcracker  l  © 2019 Rope Task Limited

 

Rope Task is rated 5 stars on Facebook based on 5 reviews

approvedkeesafety.png

safecontractor.png

chas.png

CFA logo.jpg

Rope Task Limited
Hillside House  |  5 Brunswick Terrace  |  Wednesbury
West Midlands  |  WS10 9DA
T: 0121 502 4268  |  admin@ropetask.com

fb.jpgtwitter.jpgyoutube.jpgblog.jpg