safety is our main priority

We would prefer to be as transparent as possible and show potential clients that safety is the main priority of the rope access management team here at Rope Task.

Therefore, we have updated this page with current rope access safety method statements, risk assessments and our own work procedures. 

safety is our main priority

We would prefer to be as transparent as possible and show potential clients that safety is the main priority of the rope access management team here at Rope Task.

Therefore, we have updated this page with current rope access safety method statements, risk assessments and our own work procedures. 

Sky High Rope Access

 
Rope Task have undertaken part of the glazing remedial works on Manchester famous Hilton Hotel skyscraper located on Deansgate in Manchester City Centre. Rope Task have provide an experienced rope access team to undertake the works which include the installation of hundreds of aluminium plates to the high rise tower block. 
 
 
Our IRATA rope access teams have been able to safely access the 50 storey building using detailed risk assessment and method statements along with continual monitoring of our pre-planned safe system of work. Experience of high level access has been essential in the process of selecting the correct rope access equipment, tools and experienced rope access technicians that are undertaking this difficult task.
 
 
As you can imagine a good head for heights is essential and its not every rope access company that can complete a task like this.
 
 
 
 
Loading

Rope Task Limited
Hillside House
5 Brunswick Terrace
Wednesbury
West Midlands WS10 9DA

T: 0121 502 4268
admin@ropetask.com

 

fb.jpgtwitter.jpgyoutube.jpgblog.jpg

from our case studies jaguar land rover

Rope Task were contacted by Freudenberg, a global technology​ group supplying filtration systems to high tech manufacturing plants. The problem they had was the replacement of high-level filters to the ducting systems within the Jaguar Land Rover paint shop. This was not possible using scaffold or MEWP access machines due to conveyor track systems that transport vehicles through the paint shop process...

Links   l  Privacy  l  Site MapDesigned By Nutcracker  l  © 2019 Rope Task Limited

 

Rope Task is rated 5 stars on Facebook based on 5 reviews

approvedkeesafety.png

safecontractor.png

chas.png

CFA logo.jpg

Rope Task Limited
Hillside House  |  5 Brunswick Terrace  |  Wednesbury
West Midlands  |  WS10 9DA
T: 0121 502 4268  |  admin@ropetask.com

fb.jpgtwitter.jpgyoutube.jpgblog.jpg