134 Edmund Street, Birmingham

Client
Miller Construction

Problem
134 Edmund Street is a 10 storey office building with an 8 storey internal glass atrium in the centre of the structure. Scaffolding had been removed from within the internal atrium and this resulted in safe access problems, as a number of tasks needed completing.

Solution
Rope Task technicians carried out the following tasks using rope access techniques, without the use of conventional scaffold access:

Removal and replacement of cracked glazing sheets weighing over 100kg, without the use of mechanical lifting machinery. As the space within the atrium was limited, technicians used rigging, pulley and lifting skills combined with rope access equipment, to remove and lower glazing sheets and then haul and replace new glazing, all at an height of 35 metres.

Replacement of cladding sheets to atrium walls

Mastic pointing between cladding and glazing

High level clean downs using rope access

Window cleaning using rope access

Installation of cladding panels, in confined space, using rope access

Installation of fixed safety ladders and fall arrest safety lines, to rooftop.

 

f8464705160e8ae540ba2e43c3c39437_f96.jpg

Loading

Rope Task Limited
Hillside House
5 Brunswick Terrace
Wednesbury
West Midlands WS10 9DA

T: 0121 502 4268
admin@ropetask.com

 

fb.jpgtwitter.jpgyoutube.jpgblog.jpg

from our case studies jaguar land rover

Rope Task were contacted by Freudenberg, a global technology​ group supplying filtration systems to high tech manufacturing plants. The problem they had was the replacement of high-level filters to the ducting systems within the Jaguar Land Rover paint shop. This was not possible using scaffold or MEWP access machines due to conveyor track systems that transport vehicles through the paint shop process...

Links   l  Privacy  l  Site MapDesigned By Nutcracker  l  © 2019 Rope Task Limited

 

Rope Task is rated 5 stars on Facebook based on 5 reviews

approvedkeesafety.png

safecontractor.png

chas.png

CFA logo.jpg

Rope Task Limited
Hillside House  |  5 Brunswick Terrace  |  Wednesbury
West Midlands  |  WS10 9DA
T: 0121 502 4268  |  admin@ropetask.com

fb.jpgtwitter.jpgyoutube.jpgblog.jpg