Rope access – London Zoo

When holes appeared in the Snowdon enclosure at London Zoo, the problem of access for repairs and future maintenance was solved by Rope Task.

After installing a number of eyebolt anchor points, Rope Task technicians were able to access the whole of the structure using rope access techniques.

This has now enabled easy access to the structure for rope access technicians, who since the initial installation of the anchor points have carried out a number of minor repairs to the structure.

 

Londonzoo1.jpg

Loading

Rope Task Limited
Hillside House
5 Brunswick Terrace
Wednesbury
West Midlands WS10 9DA

T: 0121 502 4268
admin@ropetask.com

 

fb.jpgtwitter.jpgyoutube.jpgblog.jpg

from our case studies jaguar land rover

Rope Task were contacted by Freudenberg, a global technology​ group supplying filtration systems to high tech manufacturing plants. The problem they had was the replacement of high-level filters to the ducting systems within the Jaguar Land Rover paint shop. This was not possible using scaffold or MEWP access machines due to conveyor track systems that transport vehicles through the paint shop process...

Links   l  Privacy  l  Site MapDesigned By Nutcracker  l  © 2019 Rope Task Limited

 

Rope Task is rated 5 stars on Facebook based on 5 reviews

approvedkeesafety.png

safecontractor.png

chas.png

CFA logo.jpg

Rope Task Limited
Hillside House  |  5 Brunswick Terrace  |  Wednesbury
West Midlands  |  WS10 9DA
T: 0121 502 4268  |  admin@ropetask.com

fb.jpgtwitter.jpgyoutube.jpgblog.jpg